Wednesday 6 November 2013

Wednesday filming

We came into school at 2.30pm and got the cameras and tripods. We then did the make and hair from 2.30 to 3.15. At 3.15 we went down to the drama studio and started to set up the staging area. We collected the mics stands and mics and set up the guitars. After we set everything up as well as the camera for the first shot we sorted the lighting and made sure the lyrics were visible on the big screen and then started to film at 3.40. We filmed all the way to 5.10. We filmed many different shots and did the song all the way through with each different shot. The photos below are of today. 





















No comments:

Post a Comment